Location 81 Peachtree Place, Atlanta, GA 30309
Prep start 01/31/17 00:00
Shoot start 02/02/17 00:00
Shoot end 02/04/17 03:00
Clear up finish 02/06/17 23:30
Type of shoot:
Large scale unit with many technical vehicles Number of crew (including any cast): Large (more than 25 people)
Traffic restriction:
South side parking lane and sidewalk closure on Peachtree Pl NE between Cypress St NE and Peachtree St NE (13 meters), 1 lane at 380 ft blocked on 1/31 2/ 4 from 12AM until 7PM (continuous) and on 2/6 from 12AM until 11:59PM, north side parking lane closure on Peachtree Pl NE between Cypress St NE and Peachtree St NE (5 meters), 1 lane at 160 ft blocked on 1/31 2/ 4 from 12AM until 3AM (continuous) and on 2/6 from 12AM until 11:59PM, West and east side lane closure on Crescent Ave NE between 10th St NE and Peachtree Pl NE, 2 lanes at 430 ft blocked on 2/2 2/ 4 from 12AM until 3AM (continuous), south side of 8th St NE between Cypress St NE and Peachtree St NE (21 meters), 1 lane at 375 ft blocked on 2/2 2/ 4 from 12AM until 3AM (continuous), north parking lane on Peachtree Pl between Peachtree St and Crescent Ave (3 meters), 1 lane at 80 ft blocked on 2/2 2/ 4 from 12AM until 3AM. Production must provide access on the east side of Crescent Avenue for Passenger Loading & Unloading Zone. Production must provide access for businesses, residents and driveways at all times. **NO WORKING TRUCKS BEFORE 7AM, NO EXCEPTIONS** AMOFE JANUARY 2017 and FEBRUARY 2017 Fees